ENGINEERING SERVICES

In order to accomplish projects of Energy District Transformation and/ or Data Center (s) placing FOSOTRA GROUP is ready to render a broad range of services, which typically include (but are not limited to):

Preparation phase

Preparation for and/or attendance at a public participation or information program.

Preparation for and/or participation in a value engineering program.

Preparation of operational studies,

Preparation of a statement of requirements and project design criteria to be used in the design process.

Participation in or preparation of specified project feasibility studies.

Preparation of and/or participation in environmental assessments and impact studies,

Analysis of information provided by the client.

Establishing the size, capacity, location, method of operation, and other principal features which form the basis for the design of a proposed project.

Preparation of a preliminary design and related reports.

Preparation of selected engineering documents.

Contractors selection and supervision

Assistance in the preparation of:

• requests for proposals, requests for qualification and tender information,

• pre-qualification documents for procurement tenders or proposals,

• tender documents.

Assistance in obtaining bids and the review of bids.

Preparation of documents in support of applications for approval from authorities having jurisdiction over the project or specific aspects of the project.

Periodic visits to the place of the work.

Attendance at meetings necessary for the coordination of the design and execution of the work.

Preparation and distribution of notes of change, change orders, and other necessary project documentation during the course of the execution of the work.

Reviewing shop drawings and monitoring compliance with the program of construction reviews and testing required by the engineer or law.

Evaluation of the contractor’s application for payment.

Review of an application for  Performance of the Work, noting any defects or deficiencies observed in the work.

Certification of the contractor’s Performance of the Work.

Project commissioning

Review of the correction of defects and deficiencies in the work when completed.

Preparation of project commissioning and start-up procedures.

Identification of deficiencies during the warranty period at the client’s request.